


QUARK DRAINER
Quark TON Drainer: The Telegram Gold Rush
TON’s transfer model means one signature moves everything.
One tap in a Mini App drains jettons, NFTs, DNS and staked balances.
TON Drainer Features
Real Wallet Selector
The modal mimics TON native wallet picker exactly – down to the icons, spacing, and animation.
Victims think they’re connecting to a legit dApp. This grants the script access to their assets.


Modal Customization
Choose from 6 different TON modals. Edit logo, text, pop up windows, wallets etc to build unique connection experience for your victims.
Live Notifications
As soon as a transaction is completed, you receive an instant alert via Telegram. Additionally, detailed logs are available in the admin panel for monitoring and analysis.


New Admin Panel
Quark Drainer’s new admin panel gives you full control over every operation.
Track approvals, manage team access, delay withdrawals, and auto-log all sessions – all from one place.
Full asset extraction - from staked TON to NFT's
Supported Assets & Protocols
Native & Jettons
- TON (native coin)
- All jettons (USDT, USDC, NOT, STON, DFC, KOTE, etc.)
- Liquidity Pool tokens (STON.fi, DeDust, Megaton)
- Staking positions (official TON staking, liquid staking protocols)
NFT & Collections
- TON DNS domains
- NFTs from popular collections (Ape, Punks, Plush Pepes, TONFISH, etc.)
- Getgems and Fragment marketplace assets
- Soulbound tokens
Quark TON Drainer is compatible with the most popular TON wallets

Telegram wallet

MyTonWallet

tonkeeper

safepal

tonhub

Toncoin wallet
Jetton Approval Exploit
TON jettons use custom approval logic. We trick users into signing a transaction that grants unlimited spending rights to your contract – then drain all jettons in one move.
Deep Link & Mini App Ready
Deploy as a Telegram Mini App or t.me link – highest conversion on TON. Victims never leave Telegram, never suspect a thing.
NFT & DNS Sniping
Drain TON DNS domains (e.g., rarename.ton) and valuable NFTs. Auto-transfer to your wallet or list on Getgems for instant liquidity.
Staking Withdrawal Trigger
If the victim has active staking, our contract automatically triggers unstake + withdraw before draining – capturing both liquid and locked TON.
Deploy the most effective TON Drainer in 2025
Quark Drainer is the only tool that automatically extracts TON, NOT, Gifts and all TON-based tokens
Includes 400+ ready-made landers, fake/stealth transaction, real-time Telegram alerts, and 24/7 support
FREQUENTLY ASKED QUESTIONS
Have questions about TON Wallet Drainer? We’ve compiled answers to the most common queries to help you understand its features, functionality, and how it can work for you.
A TON Wallet Drainer is a powerful tool designed to withdraw TON, tokens, and NFTs from Ton-based wallets like Tonkeeper, Trust Wallet, and MyTonWallet. It offers advanced features such as fake transactions, one-signature withdrawals, and real-time monitoring.
We support the most popular TON wallets, including Tonkeeper, Telegram Wallet, MyTonWallet, Tonhub, OpenMask, DeWallet, Toncoin Wallet, TonSafe, TonSpace (OKX), Trust Wallet, Atomic Wallet, Ledger, SafePal, Bitget Wallet, Huobi Wallet, Ton Rocket, TonWalletBot, Getgems Wallet, Bybit Wallet, Gate Wallet, Coin98, MathWallet, TokenPocket, Bitget Wallet Extension, TonPay, Tonmobile Wallet, Tonana Wallet, TonStakers Wallet, TonScan Wallet, TonVerse Wallet.
Yes – and that’s where 90% of TON users are. We exploit the “Sign Message” flow in Telegram Mini Apps. Fake airdrop → user clicks → signs → wallet drained.
All jettons. It detects every jetton balance and drain them via custom jetton transfer calls. No approvals needed, all just in one signature.
We trigger instant unstake (if possible) or drain the liquid staking derivative (e.g., stTON).
Rarely. We use obfuscated contract addresses and legit-looking messages. Most users approve without reading, especially in Telegram.
Yes, our team provides dedicated support to help you set up and maximize the tool’s potential.
Ready to Unlock the Power of TON Drainer?
Trusted by 140+ Professionals Worldwide
Join the Elite Group Using the Best TON Drainer!